Applications of RMCL MBR Membrane

Municipal Wastewater Treatment

Expressway Wastewater Treatment

Hospital Wastewater Treatment

Husbandry Wastewater Treatment

Chemical Wastewater Treatment

Laundry Wastewater Treatment

Check out our work

RMCL MBR Membrane Workshop

More Cases for reference

Case 1: Municipal Sewage Treatment

Kunming City, Yunnan Province, China

Project Capacity: 60,000m3/day

Running time: Since November 2018

Technology: Grille > Cyclone sedimentation tank > Anaerobic tank > Anoxic tank > Facultative tank > Aerobic tank > Membrane tank > Clear water tank

Effluent standard: Chinese 1A Standard in waste water

Stable operation since installed.

Case 2:  Municipal Sewage Treatment

Tongzhou, Beijing, China

Project Capacity: 40,000m3/day     (Peak: 56,000 m3/d)

Running time: Since January 2019

Technology: Grille > Cyclone sedimentation tank > Anaerobic tank > Anoxic tank > Facultative tank > Aerobic tank > Membrane tank > Clear water tank

Effluent standard: Below Table (B Emission Limits) of Beijing Local Standard DB11/307-2013 “Comprehensive Water Pollution Discharge Standards”

Case 3:  Municipal Sewage Treatment

Huairou District, Beijing, China

Project Capacity: 4,500m3/day

Running time: Since October 2017

Technology: Grille > Anaerobic tank > Anoxic tank > Aerobic tank > MBR membrane tank > Clean water tank

Effluent standard: Below Table  (A Emission Limit) of Beijing Local Standard DB11/307-2013 “Comprehensive Water Pollution Discharge Standard”

Stable operation since installed.

Case 4:  Municipal Sewage Treatment

Tongzhou District, Beijing, China

Tongzhou District, Beijing, China

Project Capacity: 5,000m3/day

Running time: Since November 2016

Technology: Grille > Swirling sand settlement tank > Anaerobic tank > Anaerobic tank > Facultative tank > Aerobic tank > Membrane tank > Clean water tank

Effluent standard: Below table (B Emission Limits) of Beijing Local Standard DB11/307-2013 “Comprehensive Water Pollution Discharge Standards”

Case 5:  Industrial Wastewater Treatment

Tongzhou, Beijing, China

Project Capacity: 6,000m3/day    

Running time: May 2016  (Life Cycle: 2-3 Years)

Technology: Regulating tank > Hydrolysis > Sedimentation > Aerobic > Eedimentation > BAF tank > MBR membrane tank > RO

Effluent standard: Meet the discharge standard of water pollutants for textile dyeing and finishing industry (GB 4287- 2012)

Case 6:  Chemical Wastewater Treatment

Case 7:  Printing and dyeing Wastewater Treatment

Shaoxing City, Zhejiang Province, China

Project Capacity: 6,000m3/day

Case 8:  Grinding Wastewater Treatment

Zhongshan City, Guangdong Province, China

Project Capacity: 1,200m3/day

Case 9:  Circuit board Wastewater Treatment

Huizhou City, Guangdong Province, China

Project Capacity: 1,000m3/day

Case 10:  Chemical Wastewater Treatment

Beijing Huiyuan Juice project, China

Project Capacity:  4,800m3/day

Project References From Distributors